Home Renovation: Key Steps for a Stress-Free Project

A landlord discovers that their apartment has been given an energy rating of G. Since January 1, 2025, this property can no longer…

Architecte en train d'examiner des plans de rénovation dans un appartement en travaux avec murs en béton brut

A landlord discovers that their apartment has been given an energy performance certificate (DPE) rating of G. Since 1 January 2025, this property can no longer be offered for rent in mainland France. F-rated properties will follow in 2028, then E-rated properties in 2034. The regulatory timetable sets the pace, but the renovation work often depends on constraints the landlord cannot control alone, particularly in a condominium.

Condominium renovations: approval at the general meeting before work begins

It’s easy to assume that renovating an apartment involves only private decisions. In reality, as soon as work affects common areas or changes the building’s exterior appearance, approval from the general meeting is mandatory. The property manager’s approval alone is not enough.

For example, replacing a window with one in a different colour, opening a load-bearing wall or connecting a mechanical ventilation system to a shared duct all require a vote. The co-owner must add their request to the agenda for the next general meeting, which can delay the project by several months.

This is a particularly pressing issue for landlords subject to the rental ban timetable. A landlord who needs to insulate the building from the outside or replace the shared heating system cannot act alone.

If the condominium rejects or postpones the work, the property remains unfit for rental, with no immediate recourse. In that case, you need to plan renovation work on France Immo Express by distinguishing between work within your private unit (floor and wall coverings, interior electrical work, bathroom fixtures) and work that requires a collective vote.

A practical approach is to separate the two areas of work: start the private renovations that improve the DPE rating without delay (internal wall insulation, replacing the hot water tank), while putting the shared work on the agenda for the next general meeting.

Site manager in a fluorescent vest overseeing a fully stripped-out kitchen undergoing renovation

Energy assessment and rating: check before renovating

Before drawing up a renovation plan, start with the existing DPE. The conversion factor for electricity to primary energy is set to fall from 1.9 to 1.7. For homes heated with electricity, the rating may improve without any renovation work. Existing DPE assessments will remain valid, and can be updated online if the new calculation improves the rating.

Building a renovation project solely around the current rating carries a straightforward risk: you could invest in insulation work when recalculating the DPE would have been enough to improve the property’s rating. So check which calculation method applies before spending a single euro.

What the assessment should cover in practice

  • The condition of the thermal envelope: walls, roof, ground floors and windows. A detailed assessment identifies thermal bridges and prioritises the areas that need attention.
  • The heating and hot water systems: equipment age, energy source and estimated efficiency. Replacing a boiler or installing a heat pump can have a significant impact on the energy rating.
  • Ventilation: a well-insulated but poorly ventilated home can develop damp and suffer damage to its materials. The mechanical ventilation system must be sized to match the planned insulation.
  • Electrical and plumbing systems: outdated installations may need to be brought up to code as part of the overall project schedule.

Renovation work sequence: organise the project to avoid rework

The costliest renovation mistake is completing the finishes before addressing the structural work. Always renovate from the building envelope inwards, and from top to bottom.

Start with the structure: roof, framework, load-bearing walls and floor slabs. If a load-bearing wall needs to be opened up or reinforced, this work comes first, as everything else depends on it. Next comes insulation (external insulation if approved by the condominium, internal insulation otherwise), followed by window replacement.

Second-fix work before finishes

Once the building envelope has been addressed, move on to the utility systems. Run the electrical wiring before closing up the partitions. Install the plumbing before pouring a screed or laying tiles. Install the heating system after the insulation, since it needs to be sized according to the actual heat loss of the insulated home, not the original property.

Finishes come last: plastering, painting, floor coverings, and fitting the kitchen and bathroom fixtures. Each trade must follow a specific sequence, and poorly coordinated work leads to rework that drives up the bill.

Renovation insurance and budget: what to remember before getting your first quote

For a major renovation, structural damage insurance must be taken out before work begins. In a condominium, a co-owner who commissions work within their unit may still be liable for damage to common areas or other homes, even if the general meeting approved the work.

When it comes to budgeting, compare several quotes and check that each item is broken down: materials, labour and rubble removal. A lump-sum quote with no itemised costs makes it impossible to make adjustments during the project.

  • Set aside a contingency for unexpected costs, particularly when renovating older properties, where the true condition of the structure often only becomes clear after demolition.
  • Check the eligibility requirements when submitting your application, not beforehand: schemes such as MaPrimeRénov’ and CEE programmes change every year, and the amounts or criteria in place while preparing the project may have changed by the time you apply.
  • Before signing the quote, ask each contractor for a valid copy of their ten-year liability insurance certificate.

Couple choosing paint samples in their newly renovated living room, surrounded by boxes

Renovating a home means managing a project with multiple constraints: regulatory, technical and collective. Identifying early on what you can control and what depends on a condominium vote can save months of delays. Checking how the DPE is calculated before planning the work can radically change the scope of the project. The rest comes down to good planning: from structural work to finishes, complete each stage in the right order and make sure all insurance is in place before the first hammer blow.

Home Renovation: Key Steps for a Stress-Free Project